ANSWER!

Existing barns are emptied for slurry and any dry matter, here after 40 cm of water is filled in the channels. When there is a mixture of water and slurry of 60 cm, the acidification process is started. In new barns, 40 cm of water is filled in the channels, following the same procedure as for existing stables.